Design and implementation of Monoblock foundation level change

Kashan Kavir Steel Complex is one of the largest steel production complexes in the country with a production capacity of 900,000 tons of steel per year. The capacity of this complex, which is located near Aran Va Bidgol County, will reach one million and five hundred thousand tons of steel per year performing development plans in this complex.

One of the products of this complex is the alloy rebar. In the production process of these rebars, air needs to be blown into the production rebars by special fans to change the properties of the production rebars. Due to the level of the foundation which was located below the rebar rolling line, the required fans could not be installed. Therefore, by changing the level of the foundation, the space required to install the fans had to be provided.

Design and implementation of Monoblock foundation level change

PROJECT DETAILS


  PROJECT NAME

Design and implementation of Monoblock foundation level change

EMPLOYER

Kashan Kavir Steel Complex

LOCATION

Kashan

SERVICES

concrete demolition, rebar planting, steel-jacket retrofitting, concrete-jacket retrofitting

PROJECT HIGHLIGHTS


Cutting supporting columns of rebar rolling line, without disturbing the operation of the rolling line

,