Design and execution of repairing plan for defective concrete of Stands 2 and 4
Kavir Steel Complex is one of the largest steel production complexes in the country near Isfahan and Tehran, which has a production capacity of 900,000 tons of steel per year. Its production capacity will reach one million and five hundred thousand tons of steel per year by performing development plans in this complex.
Stands 2 and 4 of this complex have suffered from corrosion and cracking due to being exposed to acid vapors, so repairing and correcting these corrosions and taking measures to prevent corrosion in the future are the main characteristics of this project.
PROJECT DETAILS
PROJECT NAME |
Design and execution of repairing plan for defective concrete of Stands 2 and 4 |
EMPLOYER |
Kashan Kavir Steel Complex |
LOCATION |
Kashan |
SERVICES |
Concrete demolition, rebar planting, injection into concrete, repair and protection of concrete surface |
PROJECT HIGHLIGHTS
Execution of the plan in 4 days on a 24-hour basis